    Maybe it’s your browser I just opened them both, did you try after you were verified or before

    Comment


    • #17
      Thanks Adphalt man

      Comment


      • #18
        Proposal terms and conditions:




        Important information to understand about Sealcoating: Sealcoating, while extending the life of your asphalt, does not give you new asphalt – only new asphalt will do that. Sealcoating does not mask cracks, depressions, repairs, divots and other surface blemishes in your asphalt. Some surfaces, due to conditions beyond our control, will display cosmetic imperfections in the finished product. Sealcoating, like paint, mirrors the surface underneath.




        Start and completion date: The contractor agrees to start and complete the work described in this contract under “Scope of work” within 60 days of the acceptance of this contract, unless prohibited from doing so by the customer, unsuitable weather conditions, or unforeseen site conditions.




        Payment terms: Payment is due upon completion of work. Please make checks payable to Arch City Sealcoating. Customer agrees to pay any late fees, interest (not to exceed 10%) and all cost for collection if necessary.




        Warranty of work: Any warranty work for failure of material or workmanship is at the discretion of and by whatever method is deemed appropriate by the contractor, for 2 (Two) years from the date of completion




        Changes to work scope: Any alteration or change from the scope of work described above will be executed only upon written orders and will be an extra charge over and above the contracted price. Any additional work will be charged at $25.00 per man hour, materials and 10% profit cost will be added to the total cost of labor and materials.




        Right to rescission: If after the customer signs this contract and 3 business days have passed without cancellation, the customer: attempts to cancel this contract, hires someone else other than Arch City Sealcoating or prevents the contractor from doing the work for more than 30 days, the customer shall pay the contractor an amount equal to 50% of the total bid, without proof of loss or damage.




        We would like to thank you for the opportunity to bid on this project. Should you have any questions, please feel free to contact us at any time. We are looking forward to working with you in the near future. All work to be completed in a manner according to industry standard practices. Arch City Sealcoating will provide Lien Waiver, Workman Comp and Liability insurance certificates upon request.




        Acceptance of proposal: We propose to furnish material and labor complete in accordance with the above specifications outlined in “Scope of work”. The above prices, specifications and conditions are satisfactory and are hereby accepted. Arch City Sealcoating is authorized to do the work as specified. All estimates must be returned with signature before any work is performed. All invoices over 30 days will be subject to interest and finance charges of 1.5% per month. This proposal may be withdrawn if not accepted after 10 days.